Wind Power Installation, Operations and Maintenance

7.5 credits

Course, Bachelor's level, 1GV128

Spring 2024 Spring 2024, Flexible, 50%, Distance learning, English

Spring 2024 Spring 2024, Flexible, 50%, Distance learning, English For exchange students

Spring 2025 Spring 2025, Flexible, 50%, Distance learning, English

Spring 2025 Spring 2025, Flexible, 50%, Distance learning, English For exchange students

About the course

The course explores the various stages and actors in a wind energy project's life cycle, which includes logistics, installation, operation and dismantling. Required project management is included and the planning tools WBS (Work Breakdown Structure) and GANTT are introduced. Various operational and maintenance strategies, and related contracts, insurance and warranties are studied and risk factors are analysed.

The course is in English but written hand-in assignments can be submitted in Swedish.

Outline for distance course: The course is given as a net-based course. Assignments are submitted in the e-classroom online and you will receive personal feedback from the teacher. A forum for discussion is available. To participate in the course you will need a computer with internet connection.

Contact

FOLLOW UPPSALA UNIVERSITY ON

facebook
instagram
twitter
youtube
linkedin