Construction work in front of Carolina Rediviva

From 6 May to 31 August, the area in front of Carolina Rediviva will be blocked off.
Construction work is underway to replace storm water pipes with a storm water reservoir. Temporary bicycle stands are located on the south side of Carolina facing the castle.
The work has been ordered by the property owner, the National Property Board of Sweden.