Information about disruptions in connection with the construction of the new tramway
1 June – 22 June
Due to work with district heating pipes in the ground, a work area will be established at the entrance to the Ångström Laboratory from Regementsvägen. Half of the roadway will be closed in connection with this, but cars and trucks will be able to pass and pedestrian and bicycle paths will be rerouted around
the site.
10 June
On 10 June, a new district heating line will be connected, which will cause an interruption in the district heating supply between 5 am–8 pm. During this time, the Ångström Laboratory will have no hot water and heating.